ATC initial training - Med delkontrakter
Formidlede anbud
-
0Siste år
-
0Siste 3 mnd
-
0Aktive nå
Avsluttet
ATC initial training - Med delkontrakter
Avinor Flysikring as provides ats to a wide range of units, including acc, app, twr, and combined twr/app units. Most units have a variety of traffic constellations including both civil and military operators, ifr and vfr operations, and a mix of these.
Avinor Flysikring as are planning to buy initial training of Air Traffic Controllers, including Basic training, adi/aps ratings and acs/aps ratings.
Suppliers must be certified training organization for air traffic controller training, according to Commission Regulation (eu) 2015/340 of 20 February 2015 laying down technical requirements and administrative procedures relating to air traffic controllers´ licenses and certificates.
The contract length will be three (3) years, with a further option for Avinor Flysikring as to extend with an additional one (1) plus one (1) year.
We are planning to educate 25 students each year. The exact number may vary from year to year.
Avinor Flysikring as will confirm the exact number of students for the following year, no later than six months before the start of the basic module.
For the first year, the scope can be reduced significantly, if needed, in agreement between the supplier and Avinor Flysikring as. This includes both the number of students and the rating modules.
Avinor Flysikring as are planning to buy initial training of Air Traffic Controllers, including Basic training, adi/aps ratings and acs/aps ratings.
Suppliers must be certified training organization for air traffic controller training, according to Commission Regulation (eu) 2015/340 of 20 February 2015 laying down technical requirements and administrative procedures relating to air traffic controllers´ licenses and certificates.
The contract length will be three (3) years, with a further option for Avinor Flysikring as to extend with an additional one (1) plus one (1) year.
We are planning to educate 25 students each year. The exact number may vary from year to year.
Avinor Flysikring as will confirm the exact number of students for the following year, no later than six months before the start of the basic module.
For the first year, the scope can be reduced significantly, if needed, in agreement between the supplier and Avinor Flysikring as. This includes both the number of students and the rating modules.
Anbud id:
510568
-
Sted:
-
Registrert:Tuesday 27. February 2018
Er du interessert i dette oppdraget?
Lignende oppdrag i
6 anbud
-
Dusj som lekkerVi har satt opp en ny dusj, men nå lekker vannet fra den ene kranen. Det drypper også litt fra vasken på kjøkkenet hele tiden. Trenger hjelp til å stoppe det.
-
Porsgrunn
-
Monday 27. January 2025
-
-
Skal legge ca 80-90 kvm parkett.Skal legge gulv på stue og kjøkken 2 etg i vår bolig. Åpent løsning med kun 2 vegger. Ønsker pris på arbeidet med legging av gulv, listeverk samt avrettning på ca 3-4 kvm på stue. Vi fjerner dagens...
-
Steinkjer
-
Monday 27. January 2025
-
-
Henting og levering av takboksHar en takboks stående på Kløfta jeg skulle ha levert til meg selv i Oslo. Helst i dag. Mvh Mikkel
-
Oslo
-
Monday 27. January 2025
-
-
Bytte strøminntak fra 1fase til 3 faseHei, Ønsker å øke strømkapasiteten inn til hytten som i dag er 1fase med 25A hovedsikring. Kraftlaget har sagt det er mulig med 3fase og 40a hovedsikring. Det et ca 2m fra inntak utside vegg til sikr...
-
Bjørnafjorden
-
Monday 27. January 2025
-
-
-
BiltransportPris på frakt av en Toyota Hiace (langversjon) kjørbar fra 4322 Sandnes til Trondheim
-
Trondheim
-
Sunday 26. January 2025
-