Skarg Power plant: Electro/Mechanical package
One singel contract covering:
Delivery and Installation of Complete Turbine Units(2) with Generators(2) and Control System
The scope of sulpply covers:
? Turbines, 2 equal sized hydroelectrical turbines
? Generators, 2 equal sized units
? Common control system for total package
? hv and lv work
The Contractor shall be responsible for the complete delivery:
? Management
? Design and Engineering
? Interface with other contractors
? Material supply
? Manufacturing
? Assembly work, work shop
? Delivery to installation site, Bykle, Norway
? Installation work
? Testing
? Trial run supervision
? Documentation
Turbines (2)
Type unit: Francis, vertical
No. Off: 2
Head-and tail water levels:
? Highest regulated head water level: 633 (m. a. s. l)
? Lowest regulated head water level: 630 (m. a. s. l)
? Highest tail water level: 551 (m. a. s. l)
? Lowest tail water level: 495 (m. a. s. l)
Water flow: 2 x 16, 5 (m3/s)
Capacity: 2 x 12 mw
An electronically governor and a high pressure hydraulic unit with an accumulator to be supplied.
Cooling water and drain system to be part of the supply.
Generators(2)
No. Off: 2
Capacity: 2x 15 mva
Requirements: According to iec 60 034.
Control and Management system (1)
Management and control of the complete system.
The system to be designed and built for manual - as well as for fully automatically operation from a Common Control Centre 30 km away from the Skarg power station.
All electrical (hv & lv) work up to connection of the grid line to be in the scope.(Transformer(1) delivered by others)
note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at (info fjernet)? id=239025.
Delivery and Installation of Complete Turbine Units(2) with Generators(2) and Control System
Delivery and Installation of Complete Turbine Units(2) with Generators(2) and Control System
The scope of sulpply covers:
? Turbines, 2 equal sized hydroelectrical turbines
? Generators, 2 equal sized units
? Common control system for total package
? hv and lv work
The Contractor shall be responsible for the complete delivery:
? Management
? Design and Engineering
? Interface with other contractors
? Material supply
? Manufacturing
? Assembly work, work shop
? Delivery to installation site, Bykle, Norway
? Installation work
? Testing
? Trial run supervision
? Documentation
Turbines (2)
Type unit: Francis, vertical
No. Off: 2
Head-and tail water levels:
? Highest regulated head water level: 633 (m. a. s. l)
? Lowest regulated head water level: 630 (m. a. s. l)
? Highest tail water level: 551 (m. a. s. l)
? Lowest tail water level: 495 (m. a. s. l)
Water flow: 2 x 16, 5 (m3/s)
Capacity: 2 x 12 mw
An electronically governor and a high pressure hydraulic unit with an accumulator to be supplied.
Cooling water and drain system to be part of the supply.
Generators(2)
No. Off: 2
Capacity: 2x 15 mva
Requirements: According to iec 60 034.
Control and Management system (1)
Management and control of the complete system.
The system to be designed and built for manual - as well as for fully automatically operation from a Common Control Centre 30 km away from the Skarg power station.
All electrical (hv & lv) work up to connection of the grid line to be in the scope.(Transformer(1) delivered by others)
note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at (info fjernet)? id=239025.
Delivery and Installation of Complete Turbine Units(2) with Generators(2) and Control System
Anbud id:
164641
-
Registrert:Tuesday 6. September 2011
Er du interessert i dette oppdraget?
Lignende oppdrag i Agder
2 anbud
-
Bygge 2 hytter ÅmliHar støpt såle til begge hyttene Jeg har fått snekkret ferdig prefabrikert vegger og har kjøpt in vinduer og ytterdør. Jeg ønsker hjelp med resten. Ring hvis du lurer på noe.
-
Åmli
-
Friday 10. January 2025
-
-
Bad og kjøkkenHei jeg ønsker å bygge ny bad og kjøkken på første etasje
-
Arendal
-
Tuesday 7. January 2025
-